SKU: LASBEP

Linea L-Shape 700mm Shower Bath End Panel (11490) White Acrylic


Click for price What's this?

Sign In For Price

  • Clock Icon In Stock For Immediate Dispatch
  • Medium
Product Details
  • 700mm Linea End Panel
  • Acrylic White Gloss
  • 5 Year Guarantee

Linea L-Shape 700mm Shower Bath End Panel

Complete your L-Shape Shower Bath with the end panel.

The finishing touch to your L-shaped bath, this end panel will seal together the whole look. Although small in size, it is much more than a added touch, it is necessary for achieving the overall completed look of you shower bath. It is made from a sturdy and durable acrylic to ensure excellent durability. The glossy white finish will also provide a brightness to your space, along with adding to the overall modern look of your shower bath. Complete your bath shower with this polished white panel in a high quality acrylic in order to hide the unsightly pipework and underside of the bath for an overall sleek and modern look.

Made for the Linea range.

This product features all the dimensions that make it compatible with the Linea L Shaped Shower Bath range. The panel is easy to fit and secure so you can get enjoying your new shower bath sooner rather than later.

If you're still not sold.

This product comes supplied with a 5 Years Guarantee in order to ensure complete customer satisfaction so you know you'll be getting the most out of your bath panelling.

Signature Features:

  • Modern White Gloss Acrylic End Panel
  • Dimensions: H 500 x W 700mm
  • Colour: White Gloss

More Information
Manufacturer Objekt Ceramica
Color White
Height 500mm
Width 700mm
Material Acrylic
Technical Sheet download Download

Location Shipping Method Shipping Charges Timescales
Mainland UK Standard Delivery £10.99 2-3 days from dispatched
Northern Ireland Standard Delivery £10.99 Next working day once dispatched
Republic of Ireland Standard Delivery £10.99 1-2 days from dispatched

We found other products you might like!
QuickDevBar 
Copyright © 2013-present Magento, Inc. All rights reserved.